Due to extensive leakage of the existing roof system, the major scope of the project entailed the removal of the 30,000 s. f. existing standing seam copper roof and deteriorated roof insulation. New roof insulation and a new pre-finished metal standing seam roof system, including remedial repairs to the existing roof structure was then installed.  All work was done while the First Division Museum remained in operation, without causing any significant interruption to the Museum’s activities.  In addition to the Construction Management Services provided during the bidding and construction phase of the project,  Sigalos also provided budgeting and value engineering services during the initial design phase of the project.